Saturday, August 25, 2018

Laying concrete, Iowa River, Iowa City


Since no truck could be backed onto the bridge to drop the concrete in place, workers instead towed a crane-lifted bucked back and forth, drizzling concrete where it needed to go as if squeezed from an enormous pastry bag.

No comments:

Post a Comment